Snowhill Timberheading (Birse)

Back to Case Studies

 

 

 

 

Snowhill, Birmingham

Timber Heading Works

Principle Contractor: Birse (2006)

ATL Scheme Ref: 212

 

The Project consisted of 4 no. Timber Headings

E1-S1 Timber Heading 15m in Length

S2 S2a Timber Heading 23m Length

S3 - S4 Timber Heading 16m Length

E6 - S15 Timber Heading 7m Length