Ipswich 2400 Wet Dock Lock

Back to Case Studies

Ipswich 2400 Microtunnelling

Ipswich - under the wet dock lock, please click above for the link to case study

If the page does not display correctly the page will prompt you to open with a different viewer  ie. acrobat reader

Also check out the Launch of the TBM on timelapse here!