Swale Pipeline (Clancy Docwra)

Back to Case Studies

The scheme involved 2nr 600mm ID auger bores underneath a railway line, each drive was 50m long and involved driving a steel pipe to allow as a sleeve for a Rising Main. The scheme was completed successfully and on budget.