News

Active Tunnelling awarded Coventry Rd, Hinkley project (NMC)

 
 
It is all part of a £1.8 million project to expand 1.5km of the existing sewer system, as around 15 homes there already suffer from flooding.
 
In general the scheme includes for the laying of pipe-work by open cut method totalling 1.5km to a depth of 2.5m – 3.5m approximately.  Work will commence  6th June 2012

The 1.5km stretch is broken into various diameters and lengths.
 
 
137m – 1800mm Concrete pipe sections.
65 Manholes between 1200mm and 2100mm.