News

Ipswich 2400mm Tunnelling

Active Tunnelling getting ready for Launch off

After the successful completion of the 2no. 27m deep Shafts underwater, Active get the Tunnelling Machine in the ground for Launch.  The Tunnel will be constructed with a 2100mm id  Tunnel Boring Machine through Chalk under  the Wet Dock Lock

A full Case study is Now Available