This methodology is commonly used when there are a large number of services in the line of the new pipe preventing a traditional open cut method and when the cover is tight thus making micro tunnelling a risky alternative.
The tunnel is constructed by hand using timber sets to support the excavation. The pipe is fed through by hand after the tunnel is constructed and the void space is then filled.